搜索
Search
/
/
/
One 62,000 DWT Heavy-Lift Multi-Purpose vessel delivered

One 62,000 DWT Heavy-Lift Multi-Purpose vessel delivered

One 62,000 DWT Heavy-Lift Multi-Purpose vessel delivered

(Summary description)On February 18,2022, one 62,000 DWT Heavy-Lift Multi-Purpose vessel “HERBERT” was delivered to Bank of Communications Financial Leasing(BOCOMM) by CSTC and Chengxi Shipyard, two subsidiaries of CSSC.The delivered vessel will be chartered to Chinese-Polish Joint Stock Shipping Company. Representatives of all parties signed the delivery documents together.

  • Time of issue:2022-02-18
  • Views:
Information

On February 18,2022, one 62,000 DWT Heavy-Lift Multi-Purpose vessel “HERBERT” was delivered to Bank of Communications Financial Leasing(BOCOMM) by CSTC and Chengxi Shipyard, two subsidiaries of CSSC.The delivered vessel will be chartered to Chinese-Polish Joint Stock Shipping Company. Representatives of all parties signed the delivery documents together. 

Mr. Marek CIESIELCZUK , Consul General of Poland in Shanghai and Mrs. Beata CIESIELCZUK, Maciej LEPICKI, General Manager of Chinese-Polish Joint Stock Shipping Company, Qiu Bo, Deputy Managing Director of Chinese-Polish Joint Stock Shipping Company,Chi Chao,Deputy Head of Shipping Finance of Bank of Communications Financial Leasing,Liang Miao, Shipping Assets Department General Manager of Bank of Communications Financial Leasing, Lu Ziyou, Chairman of Chengxi Shipyard, Zhou Jianxiang, Vice President of Chengxi Shipyard, and representatives of CSTC attended the naming and delivery ceremony. Mrs. Monika WIECHNA, Godmother of the delivered vessel, cut the ribbon and named the Vessel“HERBERT”.

With Loa of 199.90m, breadth of 32.26m, design draft of 11.3m and service speed of 14.4knots, HERBERT is the second vessel of four 62,000 DWT heavy-lift multi-purpose vessels project. The vessel is featuring green, energy saving and environmental-friendly and meets the requirements of EEDI Phase Ⅲ, NOx Tier Ⅲ and latest SOx emission requirements.

Shipyards of CSSC have built more than 50 vessels for BOCOMM, with an amount of more than RMB 20 billion. HERBERT will be managed by Chinese-Polish Joint Stock Shipping Company (Chipolbrok), which is the first joint venture in China and has made important contributions to the economic construction in the early period of the funding of the P.R. China. Chipolbrok has built a bridge of friendships between Chinese and Polish people.

Though the project was signed and constructed during the COVID-19 pandemic, CSTC, Chengxi Shipyard, and BOCOMM worked together to overcome the difficulties and made the Vessel delivered about one and a half months ahead of the contract delivery date. The smooth delivery has built a solid foundation for all parties’ future cooperation.

Relevant information

A

A great start! CSTC and DSIC win big order from Capital

China Shipbuilding Trading Co., Ltd. (‘CSTC’) and Dalian Shipbuilding Industry Co., Ltd. (‘DSIC’) have inked shipbuilding contracts for up to six LNG-powered 307,000DWT Crude Oil Tankers (‘VLCCs’) with Capital Ship Management Corp (‘Capital’).
2024-02-28
PZM

PZM Takes Delivery of New Ship

On January 23, 2024 the environmentally advanced 37,000DWT vessel named ‘Polsteam Dabie’ was delivered by CSSC Dalian Shipbuilding Industry Co., Ltd. (DSIC) and China Shipbuilding Trading Co., Ltd. (CSTC) to the international bulker specialist Polska Żegluga Morska (PZM) at DSIC’s subsidiary yard, Shanhaiguan shipyard.
2024-01-31
The

The third delivery to Enesel sealed successfully

The super-eco 114,000DWT LR2 tanker, namely MV Elytis, was handed over by CSSC Shanghai Waigaoqiao Shipbuilding Co., Ltd. (SWS) and China Shipbuilding Trading Co., Ltd. (CSTC) to the Enesel Group on January 9th.
2024-01-24
One

One more16,000 TEU containership delivered

China Shipbuilding Trading Co., Ltd. (CSTC) and Dalian Shipbuilding Industry Co., Ltd. (DSIC), both subsidiaries of China State Shipbuilding Corporation Limited (CSSC), as co-sellers, delivered one 16,000 TEU container vessel to Minsheng Financial Leasing Co., Ltd. (Minsheng Leasing) on October 30th. The new vessel is the first 16,000TEU container vessel and also the biggest container vessel for Minsheng Leasing and will be on a long-term bareboat charter to Mediterranean Shipping Company (MSC).0
2023-11-10

Head Office

Add: Office Building, Fangyuan Building, No. 56, Zhongguancun South Street, Haidian District, Beijing

Shanghai Office

Add: 22nd Floor, Marine Tower, No.1 Pudongdadao, Shanghai 200120, China

Copyright ©2021CHINA SHIPBUILDING TRADING CO., LTD.   京ICP备14011453号   Powered by 300.cn Beijing

Copyright ©2021 CHINA SHIPBUILDING TRADING CO., LTD.

京ICP备14011453号-4   Powered by 300.cn Beijing