Contract for two 2700TEU container ships with CU Lines signed
- Time of issue:2022-02-15
Contract for two 2700TEU container ships with CU Lines signed
(Summary description)On February 15th, 2022, CSTC together with CSSC Huangpu Wenchong, two subsidiaries of CSSC, signed a contract for two 2700TEU container ships with CU Lines. Li Yibo, Chairman of Guangzhou Port, Song Xiaoming, Vice President of Guangzhou Port, Chen Honghui, chairman of CU Lines, Ding Wei, Executive Vice President of CU Lines, Xiang Huiming, Chairman of CSSC Huangpu Wenchong, Li Xi, Vice President of CSSC Huangpu Wenchong and representatives of CSTC attended the signing ceremony.
- Time of issue:2022-02-15
- Views:
On February 15th, 2022, CSTC together with CSSC Huangpu Wenchong, two subsidiaries of CSSC, signed a contract for two 2700TEU container ships with CU Lines. Li Yibo, Chairman of Guangzhou Port, Song Xiaoming, Vice President of Guangzhou Port, Chen Honghui, chairman of CU Lines, Ding Wei, Executive Vice President of CU Lines, Xiang Huiming, Chairman of CSSC Huangpu Wenchong, Li Xi, Vice President of CSSC Huangpu Wenchong and representatives of CSTC attended the signing ceremony.
With Loa of 188.8m, width of 32.2m and draft of 11.5m, this ship is designed by SDARI and is equipped with AMP which has the advantage of energy-saving and environment-friendly and meets the latest requirements of EEDI III and Tier III.
Founded in 2005 and 20% held by Guangzhou Port, in recent years CU Lines has become a famous liner, running over 30 container ships and owning many international lines. CU Lines had signed four 1900TEU container ships with CSTC and CSSC Huangpu Wenchong last January. All the four 1900TEU container ships are under well construction.
The signing of two ships helps CSSC Huangpu Wenchong get the first newbuilding order in the year of the Tiger in China. And it will help strenthen the relationships between CSTC, CSSC Huangpu Wenchong and CU Lines.
Relevant information


The first LNG Dual Fuel Newcastlemax was delivered to H-line

A New Milestone: 8th 24000 TEU container vessel was delivered

Another 16000TEU container vessel was delivered to MSC
Head Office
Add: Office Building, Fangyuan Building, No. 56, Zhongguancun South Street, Haidian District, Beijing
Shanghai Office
Add: 22nd Floor, Marine Tower, No.1 Pudongdadao, Shanghai 200120, China
Copyright ©2021CHINA SHIPBUILDING TRADING CO., LTD. 京ICP备14011453号 Powered by 300.cn Beijing
Copyright ©2021 CHINA SHIPBUILDING TRADING CO., LTD.