One 62,000 DWT Heavy-Lift Multi-Purpose vessel delivered
- Time of issue:2022-04-29
One 62,000 DWT Heavy-Lift Multi-Purpose vessel delivered
(Summary description)On 20th April 2022, one 62,000 DWT Heavy-Lift Multi-Purpose vessel “PILECKI” was delivered to Bank of Communications Financial Leasing Co., Ltd. (BOCOMM) online by CSTC and Chengxi Shipyard, two subsidiaries of CSSC. The delivered vessel will be chartered to Chinese-Polish Joint Stock Shipping Company (Chipolbrok). Zhu Dezhang, General Manager of Chinese-Polish Joint Stock Shipping Company, Maciej LEPICKI, General Manager of Chinese-Polish Joint Stock Shipping Company, Fang Xiuzhi, Head of Global Shipping Finance of Bank of Communications Financial Leasing Co., Ltd., Zhou Jianxiang, Vice President of Chengxi Shipyard Co., Ltd. and representatives from CSTC attended the delivery ceremony. Representatives of all parties signed the delivery documents together.
- Time of issue:2022-04-29
- Views:
On 20th April 2022, one 62,000 DWT Heavy-Lift Multi-Purpose vessel “PILECKI” was delivered to Bank of Communications Financial Leasing Co., Ltd. (BOCOMM) online by CSTC and Chengxi Shipyard, two subsidiaries of CSSC. The delivered vessel will be chartered to Chinese-Polish Joint Stock Shipping Company (Chipolbrok). Zhu Dezhang, General Manager of Chinese-Polish Joint Stock Shipping Company, Maciej LEPICKI, General Manager of Chinese-Polish Joint Stock Shipping Company, Fang Xiuzhi, Head of Global Shipping Finance of Bank of Communications Financial Leasing Co., Ltd., Zhou Jianxiang, Vice President of Chengxi Shipyard Co., Ltd. and representatives from CSTC attended the delivery ceremony. Representatives of all parties signed the delivery documents together.
With overall length of 199.90m, breadth of 32.26m, design draft of 11.3m and service speed of 14.4knots, PILECKI is the third vessel of four 62,000 DWT heavy-lift multi-purpose vessels project. The vessel is featuring green, energy saving and environmental-friendly and meets the requirements of EEDI Phase Ⅲ, NOx Tier Ⅲ and latest SOx emission requirements.
Shipyards of CSSC have built more than 50 vessels for BOCOMM and the amount exceeds RMB 20 billion. PILECKI will be operated and managed by Chipolbrok, which was the first joint venture in China and it made important contributions to the economic construction in the early period of the funding of the P.R. China. Chipolbrok built a bridge of friendships between Chinese and Polish people.
The project was signed and constructed during the COVID-19 pandemic. What was worse, the COVID-19 pandemic outbroke again in Shanghai suddenly before delivery. However, CSTC and Chengxi Shipyard worked hard together with BOCOMM and overcame the difficulties due to working from home by the pandemic, which made the vessel delivered about four and a half months in advance of contract delivery date. The smooth delivery fully reflects the ability and responsibility of CSTC to coordinate with all parties and ensure the delivery under the current prevention of fighting against the COVID-19 pandemic.
Written by Wang Qifan
Proofread by Zhong Mao
Relevant information


CSTC/SWS win 2 newbuilding orders of114K DWT product oil tankers

One 85000DWT Bulk Carrier delivered to Seacon

CSTC/GSI delivered one MR to Nanjing Tanker
Head Office
Add: Office Building, Fangyuan Building, No. 56, Zhongguancun South Street, Haidian District, Beijing
Shanghai Office
Add: 22nd Floor, Marine Tower, No.1 Pudongdadao, Shanghai 200120, China
Copyright ©2021CHINA SHIPBUILDING TRADING CO., LTD. 京ICP备14011453号 Powered by 300.cn Beijing
Copyright ©2021 CHINA SHIPBUILDING TRADING CO., LTD.