搜索
Search
/
/
/
Steel cutting ceremony of the first medium size LNG carrier held

Steel cutting ceremony of the first medium size LNG carrier held

Steel cutting ceremony of the first medium size LNG carrier held

(Summary description)On December 28th, the steel cutting ceremony of the first medium size LNG carrier which is built for JOVO Group, was held at Jiangnan Shipyard.

  • Time of issue:2021-12-28
  • Views:
Information

On December 28th, the steel cutting ceremony of the first medium size LNG carrier which is built for JOVO Group, was held at Jiangnan Shipyard.

With overall length of 229.99m, width of 36m, depth of 21.5m, design draft of 9.8m and scantling draft of 10.4m, the vessel is equipped with MARK III Flex cargo handling system and is developed and designed by Jiangnan Shipyard.

JOVO Group, the listed domestic company, is a large private natural gas infrastructure operator and gas provider including LNG and LPG, mainly for power generation, industrial fuel gas, urban gas, etc.

The principle of "mutual trust and win-win cooperation" was implemented by all parties from the very beginning. It ensures the steel cutting milestone which marks the vessel has entered the construction stage.

 

Written by Ding Tianan

Proofread by Zhong Mao

Relevant information

One

One more16,000 TEU containership delivered

China Shipbuilding Trading Co., Ltd. (CSTC) and Dalian Shipbuilding Industry Co., Ltd. (DSIC), both subsidiaries of China State Shipbuilding Corporation Limited (CSSC), as co-sellers, delivered one 16,000 TEU container vessel to Minsheng Financial Leasing Co., Ltd. (Minsheng Leasing) on October 30th. The new vessel is the first 16,000TEU container vessel and also the biggest container vessel for Minsheng Leasing and will be on a long-term bareboat charter to Mediterranean Shipping Company (MSC).0
2023-11-10
The

The first LNG Dual Fuel Newcastlemax was delivered to H-line

On October 26th, 2023, China Shipbuilding Trading Co., Ltd. (CSTC) together with Qingdao Beihai Shipbuilding Co., Ltd. (QBS) delivered one 210,000 DWT LNG Dual Fuel Bulk Carrier, named “HL FUTURE” to H-line Shipping (H-line).
2023-10-27
A

A New Milestone: 8th 24000 TEU container vessel was delivered

China Shipbuilding Trading Co., Ltd. (CSTC) together with Jiangnan Shipyard (Group) Co., Ltd. (Jiangnan ), both subsidiaries of China State Shipbuilding Corporation Limited (CSSC), as joint sellers, delivered one 24,000 TEU container vessel successfully on October 9th. This vessel, named as “MSC CHINA”, was invested by CSSC (Hong Kong) Shipping Company Limited (CSSC Leasing) and will be operated by Mediterranean Shipping Company S.A (MSC). The delivery marks the successful completion of the total eight series of 24,000 TEU container vessels constructed by CSSC for MSC.
2023-10-19
Another

Another 16000TEU container vessel was delivered to MSC

China Shipbuilding Trading Co., ltd. (CSTC) together with Guangzhou Shipyard International Company Limited (GSI) delivered one 16000TEU container vessel on October 16th of 2023. This vessel, which was invested by CSSC (Hong Kong) Shipping Company Limited (CSSC Leasing) and will be operated by Mediterranean Shipping Company S.A. (MSC), is the 2nd one of the series of 16000TEU Container Vessels.
2023-10-18

Head Office

Add: Office Building, Fangyuan Building, No. 56, Zhongguancun South Street, Haidian District, Beijing

Shanghai Office

Add: 22nd Floor, Marine Tower, No.1 Pudongdadao, Shanghai 200120, China

Copyright ©2021CHINA SHIPBUILDING TRADING CO., LTD.   京ICP备14011453号   Powered by 300.cn Beijing

Copyright ©2021 CHINA SHIPBUILDING TRADING CO., LTD.

京ICP备14011453号-4   Powered by 300.cn Beijing