搜索
Search
/
/
/
CSTC and Jiangnan/Hudong Zhonghua delivered 5 23,000 TEU container vessels to CMA CGM

CSTC and Jiangnan/Hudong Zhonghua delivered 5 23,000 TEU container vessels to CMA CGM

CSTC and Jiangnan/Hudong Zhonghua delivered 5 23,000 TEU container vessels to CMA CGM

(Summary description)On January 20th, 2021, CSTC and Hudong zhonghua successfully delivered a 23,000 TEU container vessel to CMA CGM. So far, 5 23,000TEU container vessels have been delivered to CMA CGM. Two vessels were built by Jiangnan and three vessels were built by Hudong zhonghua,each vessel at a one-month interval.

  • Time of issue:2021-01-25
  • Views:
Information

On January 20th, 2021, CSTC and Hudong zhonghua successfully delivered a 23,000 TEU container vessel to CMA CGM. So far, 5 23,000TEU container vessels have been delivered to CMA CGM. Two vessels were built by Jiangnan and three vessels were built by Hudong zhonghua,each vessel at a one-month interval.

Like the CMA CGM JACQUES SAADE, 400m in length, 61m in width,and with a 16m draft, the other four sister vessels are the same in size,and also equipped with the world's largest dual fuel power w12*92df main engine, developed and manufactured by WinGD(a subsidiary of CSSC). This type of engine boasts state-of-the-art innovations that enable an optimization of its energy efficiency and air preservation quality. It enables a 99% reduction in sulfur oxides and fine particle emissions, an 85% reduction in nitrogen oxides emissions, and 20% less CO2, far exceeding the standing regulation. 

As an important partner of CMA CGM, CSSC maintains good cooperation with CMA CGM all the time. After the outbreak of COVID-19 epidemic, CMA CGM assisted CSTC,JN,HZ to resume construction actively. Delivery of these series vessels timely demonstrates the capacity of CSTC,JN,HZ as well as the close cooperation and solidarity among the three parties 

Relevant information

One

One 15000 TEU container vessel delivered to CMA CGM

On June 29th 2022, China Shipbuilding Trading Co., Ltd. (“CSTC”) and Jiangnan Shipyard (Group)CO.,LTD., (Jiangnan Shipyard) successfully delivered a 15,000 TEU container vessel “CMA CGM GALAPAGOS” to
2022-07-08
One

One 209,000 DWT LNG Dual Fuel Bulk Carrier delivered to EPS

On May 22th 2022, one 209,000 DWT LNG Dual Fuel Bulk Carrier was delivered to Singapore ship owner Eastern Pacific Shipping Pte. Ltd. (EPS) online by China Shipbuilding Trading Co., Ltd. (“CSTC”) and
2022-07-08
One

One 210,000dwt Bulk Carrier delivered to Santoku

On June 10th,2022, China Shipbuilding Trading Company, Ltd. (CSTC) and Shanghai Waigaoqiao Shipbuilding Company, Ltd. (SWS), two subsidiaries of CSSC, delivered to Santoku Senpaku Co., Ltd. (Santoku)
2022-07-08
One

One 50,000DWT Product Oil/Chemical Tanker delivered to KUMIAI

On May 25th, a 50,000DWT Product Oil/Chemical Tanker, named as “Lady Amanda”, was delivered to Kumiai Senpaku by China Shipbuilding Trading Co.,Ltd.(CSTC) /Chengxi Shipyard Co. Ltd.(Chengxi Shipyard),
2022-07-05

Head Office

Add: 8-18th Floor, Bldg.1, No.9 Shouti South Road, Haidian District, Beijing 100048, China

Shanghai Office

Add: 22nd Floor, Marine Tower, No.1 Pudongdadao, Shanghai 200120, China

Copyright ©2021CHINA SHIPBUILDING TRADING CO., LTD.   京ICP备14011453号-4   Powered by 300.cn Beijing

Copyright ©2021 CHINA SHIPBUILDING TRADING CO., LTD.

京ICP备14011453号-4   Powered by 300.cn Beijing